MODERNIZATION OF THE ASSOCIATED GAS UTILIZATION SYSTEM

Abstract.  In the article the ways and solutions associated gas utilization at Shakarbulak. Issues on management of the burning gases, identification of the most suitable technical financial decisions for utilization of associated gas.

МОДЕРНИЗАЦИЯ  В  СИСТЕМЕ   УТИЛИЗАЦИИ  ПОПУТНОГО НЕФТЯНОГО  ГАЗА

Аннотация.  В  статье  рассмотрены пути и решения утилизации попутного нефтяного газа  на месторождении  Шакарбулак . Вопросы по  рационального использования сжигаемых попутных газов ,определение наиболее рациональные  технические   финансовые решения для утилизации попутных газов .

 

To the national economy is based on a sound energy base, to certain strategic challenges as increasing oil production and rational utilization of associated gas.  In Tashkent hosted the regional Conference of the Europe and Central Asia, «The experience of Uzbekistan associated gas utilization and implementation of clean development mechanism projects in the oil and gas industry». The Conference discussed topical issues and possible ways to reduce burning and gas emissions into the atmosphere.[1] 

It is estimated that every year about unnecessarily wasted or burned 140 billion cubic meters of natural gas.

Since 1993, the company «Uzbekneftegaz» actively works on the use of burning gases. Using the plan on the use of associated gas, «Uzbekneftegaz» identifies the existing sources of combustion gas and determines the most appropriate technical and financial solutions for utilization of associated gas from these sources. The program is designed to assist in attracting new investment in three States-Uzbekistan, Azerbaijan and Kazakhstan, which are relevant to the issue of reducing the emission of greenhouse gases by means of their participation in the Kyoto Protocol.  Associated petroleum gas (APG), the burning of which causes irreversible damage to the environment can be a source of additional energy resources in our country.

APG is a valuable acquisition to the hydrocarbon component of that rises from the extracted, transported and processed hydrocarbons containing minerals at all stages of the investment cycle of life until the finished products to the final consumer. Thus, the characteristic of the origin of the associated gas is that it is allocated to any of the stages from exploration and production to the final realization of the oil, gas, (other sources omitted) and in the course of their processing of any incomplete product status to any of the many final products.

Get APG by separation of the multi-stage oil separators. Pressure on the steps of the separation is very different and is 16-30 bar first stage and up to 1.5-4.0 bar at last. Pressure and temperature of the mixture separation technology of associated water-oil-gas flowing from the well. Specific feature of APG is normally negligible consumption of gas, from 100 up to 5000 nm ³/h. Hydrocarbon H3 + can range from 100 up to 600 g/m³. The composition and number of APG is not a constant. There are both seasonal and one-off fluctuations (normal values up to 15 per cent). 

 Experience times of development of hydrocarbon deposits shows that from the point of view of the effects of the development of the times, environmental factors are most complex oil months ¬  with small thickness oil field Shakarbulak as edgings. [1]

In order to meet the needs of the national economy of natural gas, as well as improve the development of Shakarbulak was carried out based on the initial system development in the joint operation by means of perforations in oil rim and condensate wells of deposits. Transition to joint operations of oil and condensate parts field has dramatically increased the pace of the selection of oil from 85.9 thousand t (2008 ) to 164.6 thousand t (2009 ). There is a natural increase in the wells for oil and gas growth factor respectively.

As a result of the joint selection of oil and gas has been a natural process of increasing associated gas produced along with oil due to the inflow of gas-condensate deposits part of well. The need to meet this challenge is a joint oil and gas extraction. Increase the gas factor has increased wellhead pressure in wells. If wells №. 1, 17, 20, 31, operating virtually only the oilsaturation portion of the formation, the wellhead pressure in gas form from 350 m3/t to 1305 was 1.5-6.0 MPa, the wells №. 3, 4, 21, 23, 30 in gas form 5750-6269 m3/t wellhead pressure has risen 15.8 -21.6 MPa.

Increased pressure in the wellhead wells allowed professionals «Gissarneftgaz» JE oil preparation «Shakarbulak »mounted and put into operation in February 2009, the block separators for separation and gas under its own pressure. (up to 10 Mpa) at  HE «Shurtan». To the block separators were connected bore hole Nos. 3, 4, 21, 23 .30 having high pressure wellhead. This allowed the 2009y. «Gissarneftgaz» JE of associated petroleum gas produced at the field Shakarbulak in the volume of 422.3 million m3, recycle 367.0 million m3, i.e. more 86.9%.[3]

  Thus, it can be concluded that the change of the system implemented originally oil-field Shakarbulak led not only to a change of technological indicators, and to the need to address existing environmental problems in a more compressed.

List of references :

 

 1. Zorina O.A. Operativniy  podschet  I pereschet  zapasov nefti, gaza I kondensata po vnov otkritim I naxodyashimsya v razvedke mestorojdeniyam AK «Uzgeoburneftegaz», vedenie balansov zapasov nefti gaza I kondensata.//Tashkent Fondi. IGIRNIGM 2005 g.

2. Zuev S.N. Poiskovo-razvedochnie seysmorazvedochnie raboti ZD v predelax Shakarbulak-Chunagarskoy gruppi struktur v vostochnoy chasti Beshkentskovo progiba.//Otchet  Beshkentskoy  s.p.11/2002-2005.2007 g.

3. Pak S.A. Pereschet  zapasov  nefti  I gaza  mestorojdeniya Shakarbulak  v Respublike  Uzbekistan.//Fondi OAO «Uzgeoburneftegaz», 2004 g.

 

Список литературы:

1. Зорина О.А. Оперативный подсчет и пересчет запасов нефти, газа и конденсата по вновь открытым и находящимся в разведке месторождениям АК «Узгеобурнефтегаз», ведение балансов запасов нефти газа и конденсата.//Ташкент Фонды. ИГИРНИГМ 2005г.

2. Зуев С. Н. Поисково-разведочные сейсморазведочные работы ЗД в пределах Шакарбулак-Чунагарской группы структур в восточной части Бешкентского прогиба.// Отчет Бешкентской с.п.11/2002-2005.2007г.

3. Пак С.А.Пересчет запасов нефти и газа месторождения Шакарбулак в Республике Узбекистан.// Фонды ОАО «Узбекгеофизика»,  2004г.