ÓÄÊ: 622.882.2
Director and
Professor Xinhai Lu, PhD student Bakhtiyar
Yasmina
Research Center for Land Resource & Real Estate,
Huazhong University of
Science and Technology
ANALYSIS
OF THE DUMPING PRACTICE AND LAND
RECLAMATION CONDITION AND THEORY
As
practice showed, the planning works volume at slopes recultivation depends on
a natural slope corner of the stocked rocks, a flattening corner,
assizes perimeter and quantity, and also the specified works implementation
technology.
In
works [1-4] the questions of derelict lands reclamation in various regions,
methods of lands violation regulation and an environmental problem of mining
are in detail stated. Despite comprehensive consideration of remediation works
questions in them recommendations about land reclamation intensification when
open-cast mining of superficial type fields aren't made [1].
Works [1-4] are devoted to explosive seismic safety
increase questions on openpits, improvement of lands recultivation technology
at a fields development open way, dump and remediation works using the mobile
equipment and environmental protection at an open mining. At the same time, in
these works aren't given researches on selective placement in a dump body of polytypic rocks on
suitability them for the recultivation purpose.
Management of open mining dumps, production and recultivation on construction rocks
openpits, research of the rational production technology of overburden, dump
and remediation works, lands use, recultivation at the mining enterprises both
recreational use of territories and forest conservation are in detail stated in
works [2]. However in the given sources the questions of the openpits developed space recultivation
after the end of their working off aren't considered.
Thus, follows from the above that at poured-out dumps
recultivation it is necessary to perform large volume of planning works that
involves derivation of the capital dump equipment, or attraction additional
that leads to significant increase in mineral production cost. Thus the gap in
time between the beginning of earth withdrawal and the beginning of its
recultivation is very considerable and close to the term of a dump
construction. Therefore, for timely external dumps recultivation and costs
decrease in its carrying out there is a need of stacking technology improvement
at open-cast mining of superficial type deposits in close interrelation with
recultivation.
Gross and selective ways of dumps formation apply on
openpits. A gross way as the simplest, is expedient by dumps preparation under
forest plantations when overburden rocks properties under the terms of
biological development are favorable for trees and bushes planting. By
preparation of such dumps the gross way of dumps formation with the surface
subsequent covering a soil layer is applied to agriculture and gardening.
Existence in overburden thickness of rocks, unsuitable for biological
development, demands selective formation. In this case potentially fertile
breeds are marked out in a separate ledge and transported in the top assize of
a dump. The selective way of a dump formation complicates conducting overburden
and dump works, and in certain cases causes the necessity of the additional
equipment use. However thus remediation works prices are reduced and favorable
conditions for effective biological development of the derelict areas are
created. Therefore much attention is paid to dumps selective formation.
The
greatest difficulty at recultivation is presented by slopes selective formation
of external buldoser dumps. In work [3] authors offer new designs of the
planning equipment for a dumps slopes flattening. In work [4] it is offered to
make a flattening only on part of assize height to a mark on which height of a
nonflattered slope provides erosive stability. Other authors for slope part
flattening suggest to use draglayna [2-4]. In our opinion, it is most rational
to flattening and selective form dump slopes with the capital equipment due its
dumping, but not after or to exclude mining and planning works on a flattening
of dump assize slopes.
From
the analysis of the stacking and land reclamation theory and practice condition
it is visible that the variety of mining-and-geological and mining conditions
in which mineral deposits are developed excludes application of universal
technology and uniform means of mechanization for a recultivation technical
stage performance. Studying of the existing experience on technical
recultivation works when buldoser dumps shows that such questions as dumps
slopes formation, a choice of development schemes of the dump works front
taking into account existence of unsuitable breeds and a place of their bedding
in contours of a openpit, an exit dynamics of potentially fertile breeds remain
not studied. The question of selective formation of external buldoser dumps at
open-cast mining of superficial deposits is also insufficiently studied.
For
an intensification of a buldoser dump recultivation it is necessary to
establish the major factors influencing selective formation and reduction of
expenses at land reclamation.
Thus,
as a result of the executed scientific researches, design development and
synthesis of the mining enterprises' work practice considerable methodical
material on land reclamation is saved up. At the same time the technology of
selective formation and buldoser dumps recultivation when developing
superficial deposits in the open way demands further improvement taking into
account combination of overburden, dump and remediation works.
References:
1. Sabirova L.B. Slopes rekultivation
at an external dumping on open-cast minings//the Second International
scientific and practical conference devoted to the 15 anniversary of
independence of the Republic of Kazakhstan "Mining and metallurgy in
Kazakhstan. A state and prospects" - Almaty, 2006, V.1. Page 201-203.
2. Sabirova L.B.
Development of vein fields of a superficial bedding taking into account
recultivation. - Almaty//Messenger of KAZNTU No. 3 (20). 2007. Page 186-189.
3. Sandibekov M. N.,
Sabirova L.B. Features of recultivation of an external buldoser dump on
superficial pits//the International conference devoted to the 100 anniversary
Al-Mashani. 4.11. - Almaty, 2007. Page 261-263.
4. Sandibekov M. N.,
Sabirova L.B. Recultivation method when developing vein fields in the open way.
- Almaty//Messenger of KAZNTU No. 1/1. 2007. (58) Page 224-230.