Ê.ý.í. Êèðäàñèíîâà Ê.À.

Òëåãåíîâà Á. -ìàãèñòðàíò

ÅÍÓ  èì.Ë.Í. Ãóìèëåâà, Àñòàíà, Êàçàõñòàí

THE USE OF MODERN METHODS OF MANAGEMENT IN TECHNOLOGICAL REARMAMENT OF TRANSPORT BRANCH IN KAZAKHSTAN

The message of the President of the Republic of Kazakhstan "Kazakhstan - 2030" states: “The goal of Kazakhstan is providing the competitiveness of domestic transport and communication complex in the world market and increasing trade flows through our territory”. In order to achieve these goals in 2012 corporation “National Corporation Kazakhstan Temir Zholy” sold 4 large innovative projects:

1.     Construction of the railway line Korgas-Zhetygen

2.     Factory of locomotive assembling in Astana “Lokomotiv kurastyry zauty”

3.     Factory of producing passenger carriages “Talgo” in Astana

4.     Technological rearmament of LLP industrial complex “Taman” for cargo carriage production organization 

Construction of the railway line "Zhetygen-Korgas" – one of the largest projects of transport branch of Kazakhstan. The highway has an important strategic importance as with its input the second railway transition between Kazakhstan and China opens.

         On a network of the railroads of the Republic of Kazakhstan passes some international transport routes which have been officially included in system of the Eurasian overland corridors. Among them the special place belongs to the Chinese-Kazakhstan transport corridor passing in the East-West direction from seaport Lianyungang (east coast of China) through frontier transition Dostyk – Alashankou and the territory of Kazakhstan with an exit to a network of roads of Russia (through Ozinki's frontier transitions, Aksarayskaya on Novorossiysk port, frontier transitions Brest, Chop, the station Petropavlovsk and further St. Petersburg, Murmansk and Central Asia through frontier transition Saryagash).

         Improvement of railway infrastructure of these corridors – a real step on a way of stage-by-stage increase of competitiveness of a transport complex of Kazakhstan as a part of the Eurasian network of the international transport routes.

         Extent of a railway line Korgas - Zhetygen is 293 km. The project provides opening of 14 new separate points.

         Construction of the new railroad Korgas-Zhetygen became an important step in formation of the shortest railway direction from border of China to the southern regions of Kazakhstan, the countries of Central Asia and Aktau port. Implementation of the project will provide the solution of the following major strategic tasks:

• expansion of opportunities of realization of an export potential of the country;

• creation of the second (along with frontier transition Dostyk) the transit overland message in the direction Europe – Asia on the territory of the Republic of Kazakhstan;

• considerable reduction of distance of transportations of export-import freights.

         The new railway line Korgas – Zhetygen is the breakthrough project, allowing reducing range of freight transportation:

• between the countries of the Far East (Korea, the People's Republic of China, Japan) and the southern regions of Kazakhstan, the countries of Central Asia, Iran, Transcaucasia and further on 500km. ;

• between Persian Gulf  and the Far East in a complex with the project of the new railway line realized in Iran Bafk – Mashhad on 1300 km.

Factory of locomotive assembling in Astana “Lokomotiv kurastyry zauty”. Domestic production of locomotives is implemented within the State Program of Forced Industrial-Innovative Development of Kazakhstan.

These locomotives are assembled on the newest technology of the “General Electric” company (USA) and are a competitive product in the world market. Interest to production of domestic engineering industry is shown by railway administrations of other countries.

New machines are tested to various types of 19 tests, including tests of electrical and mechanical parts, work of diesel-generator installation as a whole and durability of seams of the case is checked, pro-running tests on the highway lines are carried out by corporation “National Corporation Kazakhstan Temir Zholy”.

On the assembly line of the modern enterprise is coming off, on average, 6-8 TE33A cargo locomotives per month. Work on the factory is conducted round the clock and staff works in 3 shifts in order to maintain the level of productivity.

The anniversary locomotive “Evolution” with road number 100 is developed in November 2012 in the new locomotive assembling factory, just before the end of 2012, 109 locomotives are produced. Production capacity is 100 units per year.

A contract to export Kazakh six locomotives to Tajikistan is signed.

In December 2011, the launch of a new factory for the production of modern high-speed passenger carriage "Talgo".

  Design capacity of the enterprise – 150 cars a year, at the initial stages of production - from 30 to 140 cars a year. Constructional speed of cars – 200 km/h that allows to use them in high-speed movement. The independent suspension bracket of wheels, hinged connection of cars, adaptedness to climatic conditions of Kazakhstan provide comfort of passengers in ways and high level of traffic safety. With an exit to design capacity at plant 366 new workplaces will be created, level of localization will reach 56%, labor productivity on 1 worker will make about 98 thousand dollars of the USA.

Level of the Kazakhstan contents in production by 2015 will reach 56%.

New production plays a key role in ensuring implementation of the Program of development of high-speed passenger traffic RK and will allow to reduce time of following of trains in a way in all interregional directions twice.

On July 1, 2012 the first train, collected from Talgo cars produced in Astana started running. The train will carry passengers from Almaty to Petropavlovsk.

Modernization of industrial complex Taman LLP for the organization of release of freight cars. For a covering of existing deficiency in a cargo rolling stock in 2010 on the basis of Taman LLP production of freight cars is organized. In 2010 the 1st and 2nd starting complexes are put into operation. In July, 2011 the 3rd starting complex is started. Capacity makes 3000 units a year.

For 2012 the following large projects were realized:

1. Works are completed and movement on again constructed railway lines "Korgas-Zhetygen" and "Uzen — Frontier with Turkmenistan" is opened, the mastered volume of investment (including building of objects of customs and boundary infrastructure and objects of social purpose of a railway line Zhetygen-Korgas) in 2012 made 38 970 million tenges;

2 . Within creation of domestic engineering transport industry construction of factory on release of Talgo cars and the first stage of plant on production of modern electric locomotives on technology of the “Alstom” company is complete. The project on modernization of shop of large carriage molding on the basis of Vostokmashzavod corporation is realized, the additional processing equipment for plant on release of Evolution locomotives is bought, the general mastered volume of investment according to these projects in 2012 made 14 030 million tenges; also in December, 2012 shop opening on assembly of shunting locomotives on technology of the CSR company (China) on the basis of Shusky lokomotive factory;

For effective achievement of the main goal of “National Corporation Kazakhstan Temir Zholy” Company it intends to work systematically in the following four strategic directions:

1.                 Increase of efficiency of productive and economic activity of “National Corporation Kazakhstan Temir Zholy” Company

For ensuring growth of the cumulative share capital the Company will carry out transition from the cost-oriented corporate culture to the culture aimed at maximizing efficiency of involved resources and processes.

Also for ensuring the current operational stability, and also increase of competitiveness of rendered services, in “National Corporation Kazakhstan Temir Zholy” Company actions for decrease in production and administrative expenses will be carried out.

2.                 Preservation of leading positions in the market of freight transportation.

For ensuring the planned growth of profitability in the market of freight transportation of Company has to hold not less than 80% of a share of the market after opening of access to railway infrastructure the Program of development of railway transport of the Republic of Kazakhstan provided by the project till 2020.

For this purpose in the Company it is necessary to introduce customer-oriented approaches in rendering the transportation services, most aimed at satisfaction of transport and logistics needs of clients.

Expansion of a segment of transportations of production with a high value added will demand increase in a share of the offer in the market of hi-tech transport services as the condition of competitiveness of a domestic production with import analogs transfers the international requirements to production efficiency and logistics to our market.

Formation of a full range of the integrated transport and logistics services with formation of necessary structure of assets, such as the transport and logistics centers, vehicle fleets and port infrastructure is for this purpose provided.

3. Formation of effective structure of portfolio and production assets.

4. Increase of controllability of activity.

Actions for increase of controllability of activity of “KTZ” Company will affect administrative aspects of activity.

There are goals for each of these strategic directions which achievement will allow to carry out the above strategic intentions of “KTZ” Company are formulated.

States intent to liberalize the railway industry and related institutional changes will be reflected on the structure of “National Corporation Kazakhstan Temir Zholy” Company as sectored forming the subject of the economy. In this regard, “National Corporation Kazakhstan Temir Zholy” Company planned major restructuring of portfolio assets that would create an optimal structure based on corporate and industry interests (focusing resources on core activities and to promote the development of industry and engineering of repair facilities).

Along with transformation of structure of financial assets optimizing changes will concern also production assets. There will be a radical updating and modernization of fixed assets of “KTZ” Company which will be whole branch’s part of the investment program.

However, implementation of promising programs and strategies rail transport system faces difficulties:

- The territory of the underdeveloped infrastructure and poor technical condition , depreciation of fixed assets industry , which reaches 70% , inadequate repair tracks and rolling stock , as well as the poor quality of repair, which is caused by lack of funding , lack of qualified staff and poor organization of transport processes ;

- The problem of empty runs freight cars owned by private companies - one of the major constraints on the development of rail transport , as increases the cost of transportation, excessive loads and destroys the network;

- The industry has not formed a real competitive environment, because reforms were not sufficient justification and appropriate elaboration of legislative and regulatory framework defining the rights and responsibilities of each entity;

- Monopolistic activities of private companies in the industry leads to an increase in freight rates, not accompanied by an adequate increase in the quality of transport services , misallocation of freight cars, insufficient development of container transport , which also related to the lack of adequate infrastructure and poor coordination of the activities of private owners of cars;

-        Low level of transport service, problems with cargo safety.

 

Literature:

1. Àòàìêóëîâ Å.Ä., Æàíêàñêèí Ê.Ê. Æåëåçíîäîðîæíûé òðàíñïîðò Êàçàõñòàíà. – Àëìàòû: ÌÒÈÀ, 2001, ò. 2, - ñòð. 66.

2. http://ru.wikipedia.

3. http://www.slideshare.net/aizhan_zo/ss-12525552

 

 

 

 

info@rusnauka.com.