Calculation and method choice
barring of boards of a ditch by protecting bored piles for opening of a ditch of the Lobby station "Baikonur" subway of
Almaty.
Construction
lobby belongs in the open way to difficult types of works in a metro
engineering as it is connected with disclosure of a volume ditch, with
disclosure of developments of big section, and also with the device of a
complex of the interconnected constructions. It directly lobby, and also
escalator tunnel, entrances and under crossing, ventilating channels and other
external networks. Construction conduct in such technological sequence not to
allow a sagging of the crust surface, buildings dangerous to safety edifice and
constructions, and also a sagging of underground communications of the
municipal economy located in borders of a theoretical prism of a collapse of
boards of a trench. Motions of the
ground massif have to be minimum.
During
geological researches, on the Baikonur station platform geological developments
from a surface opened the 1,0-1,5 m bulk ground presented by loam to easy,
dusty with roots of plants, with pebble, construction garbage, asphalt of the
carriageway of roads.
Below
pebble soil alluvial proluvial origins of quaternary age, low-damp, with
sand-gravel filler and inclusion of well pebble rubbles by the size to 700мм to 40% from the
total amount of ground of roads lies. Petrography the composition of ground is
presented by fragments of granites and granodiorite gray color, fragments of
quartzites and siliceous sandstones less often meet.
Pebble
ground by results of the carried-out chemical analysis isn't salted and doesn't
possess corrosion activity to concrete and fittings. Underwater on a station platform Baikonur aren't
opened.
The
lobby of Baikonur station is located near buildings of multistoried city
building and streets with heavy traffic of city transport that is an additional
complicating factor for construction.
In the
course of construction continuous control of deformations was conducted fix
also the buildings which have been close located to a ditch.
During
the carried-out analysis and calculations, and also comparison of economic
indicators of a pile wall and "slurry wall" shows that the pile wall
is more economic at the small volumes and with a big length of a protection the
"slurry in wall" is more favorable ".
In this
regard, it was decided fence bored piles.
When
fastening a ditch of the station "Baikonur" by protections from bored
piles. On a development contour before excavation the faltering pile wall
perceiving horizontal loadings is erected.
In this
regard the decision to use a protection from bored piles was made.
The
protection from bored piles belongs to being low-deformed types of fastening
therefore the decision to apply at big loadings on a ditch brow was made. Drilling
of wells under protection of clay solution or upsetting pipes doesn't cause
considerable changes of tension in soil that excludes opportunity a deposit of
nearby buildings and constructions.
Walls
with a faltering arrangement of piles arrange in the dry coherent ground,
capable to hold a vertical slope 1 ¸ 2 m high. Interval between piles for prevention of
local inrushes protects a wooden inhaling.
Boring
piles produce according to such technological scheme: the well is drilled, the
fittings are installed, and then a well fill with a concrete mix. Thus there
are more than a half of expenses of work, to time and cost it is the share of
well drilling.
Driving
of wells carry out boring MUSTANG 5-P4 installation. Upsetting pipes are
applied to prevention of a collapse of walls of wells when drilling.
Fastening
of boards of a ditch are made from bored piles ∅168х8мм, with filling of these piles with class B25
concrete. Piles settle down at a slow pace 500мм on an axis.
Upsetting
pipes are left in soil they entered into a design of piles. Upsetting pipes
plunge into soil by means of vibration in the course of drilling.
Drilling
of wells of advancing fastening is made in a mode of shock and rotary drilling
by the MUSTANG 5-P4 drilling rig, direct washing of wells with water when
drilling wells of long 10500 mm.
Limit
tolerances of a tilt angle of a well concerning D=± 1,5° vertical.
Limit
tolerances of length of a well of rather design D=+200 mm.
Bored
piles with an upsetting pipe are applied in unstable ground: gravel and pebble
deposits, rubbles.
The
simplified scheme of a construction of piles: leading well drilling; immersion
by a mechanical or pneumatic hammer of a pipe; well cleaning inside to the
basis; concrete acceptance.
Purpose
of these piles – the bases and a protection of ditches.
Piles
on length reinforce longitudinal cores of a periodic profile with a step no
more 200мм.
Cross
fittings from steel with a diameter from 6 to 12мм install with a step 150¸200мм.
At
installation of a framework the fittings sheeting with a concrete layer
thickness not less 50мм has to be provided.
Wells
concrete a cast concrete mix with a cone emptying 160¸200мм free dumping.
Concreting
by free dumping of a concrete mix in a well carry out in the absence of water
and length of piles to 10м.
For
association of separate piles in walls arrange longitudinal belts from steel
profiles and the ferroconcrete beam concreted on a place. The ferroconcrete beam is at
the same time single pour pile head and a side protecting a ditch from storm
waters.
Piles
in dimensions of designs of foot tunnels of entrances to a lobby are subject to
partial dismantle (extraction). In
this regard in the project it is provided that the piles which are subject to
partial dismantle (extraction) aren't filled with concrete and fittings on
height of the site which is subject to partial dismantle. On height of the site
which is subject to partial dismantle, a pile are filled with local ground.
On the
basis of the carried-out calculations, for a choice of the most optimum choice
of fastening of boards of a ditch of the Lobby of station "Baikonur, the
solution of a choice construction by a method of bored piles was made. That in the conditions of
construction in difficult mining-geological conditions is the most optimum.